MIKE HYDRO hotfix 21-02-2018

This hotfix is enables the following:

-       Forces the storage demand rule releases to be routed through hydropower plants, when the two involved reservoirs are physically connected

-       Make all Reservoir releases routed through hydropower plants as default behavior. Spill is only considered if the water is released due to surpassing the damn crest level, or the flood control release that does NOT go through Hydropower plant.

(Note: this hotfix is an improved version and replaces a former hotfix MIKE_Zero_2017_18.01.29.exe.)



FILE INFORMATION

File nameFile size
MIKEZero_2017_180221b.zip1.6 MB

Download from US East
- If you are from North America, Latin America, Europe, the Middle East or Africa:

Download from Singapore
- If you are from the Asia-Pacific region: