MIKE HYDRO hotfix 21-02-2018
This hotfix is enables the following:
- Forces the storage demand rule releases to be routed through hydropower plants, when the two involved reservoirs are physically connected
- Make all Reservoir releases routed through hydropower plants as default behavior. Spill is only considered if the water is released due to surpassing the damn crest level, or the flood control release that does NOT go through Hydropower plant.
(Note: this hotfix is an improved version and replaces a former hotfix MIKE_Zero_2017_18.01.29.exe.)
FILE INFORMATION
File name | File size |
MIKEZero_2017_180221b.zip | 1.6 MB |
Download from US East
- If you are from North America, Latin America, Europe, the Middle East or Africa:
Download from Singapore
- If you are from the Asia-Pacific region:
Please note
You may have downloaded this file before and therefore you may not need to download it again.
MIKE 21, MIKE 3, MIKE C-MAP, LITPACK, MIKE Animator Plus, MIKE SHE, MIKE HYDRO Basin, MIKE HYDRO River, MIKE FLOOD and MIKE 11 are all based on MIKE Zero and thus no other downloads are required.
Click
here if your download did not start automatically.
Your Profile
It's been a while since you last updated your profile. Please update it.